-
Suggest a BOD Meeting Topic
-
NuGrape Contact Information
-
Roof Access Request
The NuGrape BOD has adopted this policy as of May 2018 and is effective June 1, 2018. The NuGrape roof structure, sub-surface, and surface are very delicate. Portions of the roof have little more than the ceiling joists and wooden slats below the foam and roof membrane. Once the roof membrane is penetrated, water can…
-
Common Area Noise Tracking
-
NuGrape Contact Information
-
Contractor Roof Access Request
NuGrape has adopted this policy as of May 2018 and is effective June 1, 2018. The NuGrape roof structure, sub-surface, and surface are very delicate. Portions of the roof have little more than the ceiling joists and wooden slats below the foam and roof membrane. Once the roof membrane is penetrated, water can infiltrate the…
-
Thank you!
-
Suggest a BOD Meeting Topic
-
Lease Permit Request
Use the form below to request a lease permit. If a lease permit is available, you will be notified. If a lease permit is not available because the Leasing Cap has been reached AND you have selected to be added to the wait list, you will be notified of your position on the wait list.
-
Roof Access Request
The NuGrape BOD has adopted this policy as of May 2018 and is effective June 1, 2018. The NuGrape roof structure, sub-surface, and surface are very delicate. Portions of the roof have little more than the ceiling joists and wooden slats below the foam and roof membrane. Once the roof membrane is penetrated, water can…